The design would be simpler if water was flowing exactly at the same time.

It does not.

The quantity of wastewater flowing into the residential system can vary throughout the day. Industrial and commercial structures may have operating peaks. Stormwater levels can drastically change with the weather. Demand for clean water can also change according to the type of application.

When designing the perfect pump station, it is not just about selecting the equipment that can provide a certain flow. Engineers need to be aware of the various conditions the system is likely to encounter.

Image credit: romtecutilities.com

Don’t just think about the capacity of your equipment, but also operating conditions

The flow rate is of course crucial but it’s just one part of station operation. If a system for wastewater is built to support a flow. The majority of the time the flow inflow is less. The station still needs to function properly during these normal intervals.

This brings up questions about wet-well sizes, pump operation controls, head conditions, and how the equipment responds to demand fluctuations.

A properly engineered package pumping system brings these considerations together around the actual requirements of the site instead of treating maximum pump capacity as the entire design objective.

The wastewater industry has its own day-to-day Rhythm

A wastewater lift station servicing homeowners, businesses or municipal infrastructure might have varying influent conditions during its life cycle.

The station’s control plan will decide how the station takes in wastewater and runs its pumps. The structural dimensions, the pumps and the piping, as well as electrical parts and controls all play a a role in this process.

The design can also incorporate aspects specific to the particular site. Romtec Utilities can incorporate auxiliary equipment such as grinder vaults and odor control equipment when required by the application. It is more cost-effective to design the station around a specific project rather than using a generic configuration for every wastewater treatment facility.

Stormwater is able to change significantly faster

Stormwater is a different operating environment. When it is dry, a stormwater lift station could not be utilized as frequently. But during the most severe weather events the station will be able to witness an increase in activity. The station may be part of a larger flood-control or detention, treatment or drainage strategy, which makes the stormwater plan surrounding it an important element of the design.

When designing these systems Romtec Utilities considers a variety of elements, including the flow rate that is required, head condition, dimensions of the system, site requirements and environmental factors.

A station for a commercial property could therefore appear quite different from one engineered to serve a municipal stormwater system.

Head Conditions are Important as well as Flow

The task of moving 1,000 gallons is not the only problem for engineering. Engineers should also be aware of the direction of the water and the kind of resistance the pumping system must overcome.

The head of the pump is influenced by several factors which include elevation variations, piping configurations, discharge conditions and other system aspects.

That relationship between head and flow is the reason why choosing the right pump based on its capacity rating doesn’t suffice. The design and technology of the pump must meet the hydraulic demands of the application.

Design for the conditions the station will experience

Romtec Utilities creates customized pumping system for wastewater, stormwater and clean water systems. They also develop systems for industrial, booster and other applications. The procedure can involve budgeting and design in the beginning and plans for complete systems, supply, documentation, and startup, testing and commissioning.

The premise behind the system is as simple as this pumps don’t require a long time to work in a set of favourable conditions.

They have to contend with changing flows, changing demand, and particular hydro requirements of the project. It is important to create a station that is able to manage this challenge.